2/20/2015
7-9pm
2/21/2015
9:30-11am
Friday night the DSC closed early and the mybucknell cas system was down, so I will be sending what I worked on to print tonight. I finished making all the pieces attached to the actual cathedral blocks. And in the morning finsished all of the test pieces of the lego inserts and prepared them to be printed.